Back to Modules

Performance Tests

Summit Fire Equipment, Inc. field workflows

Database setup pending
Not signed in

Standalone Test Workflows

Select a performance test to run independently or attach it to a PM package later.

Pump Performance Test

Ready

NFPA 1910 pump capacity, overload, flow, pressure control, interlock, signoff, PDF, Drive, and Sheets workflow.

Go to test

Aerial Performance Test

Ready

NFPA 1911 Chapter 23 workflow for aerial ladders, elevating platforms, water towers, load tests, waterway checks, records, and signatures.

Go to test

Road and Weight Verification

Ready

NFPA 1910 Chapter 20 axle weight, braking, parking brake, and road test workflow.

Go to test

Low-Voltage Electrical

Ready

NFPA 1911 Chapter 21 battery, starter, alternator, regulator, charger, load, relay, and alarm testing.

Go to test

Line-Voltage Electrical

Ready

NFPA 1911 Chapter 26 power source, receptacle wiring, GFCI, equipment, and full-load testing workflow.

Go to test